Initial contact can remain minimal.
Scope, field, timing, and routing requirements are sufficient at intake.
One page. Three separate intake routes. Each route is designed for a different level of disclosure and a different type of material. Partner-led and subcontracted workstreams can be routed through the RFP / Intake path.
Initial contact with minimal disclosure for early-stage or sensitive requests.
OPEN ROUTEStructured intake for a defined requirement with clearer scope, timing, and output expectations.
OPEN ROUTESupporting materials can be routed separately when disclosure is staged or when the file package stands on its own.
OPEN ROUTEBefore submitting a defined requirement, you may review ICG’s decision situations, forms of work, applied capabilities, professional boundaries, and selected project experience.
OPEN CAPABILITIES & EXPERIENCE PDFSensitive detail does not need to be disclosed at first contact. Use this route when the need is still being defined, when exposure is not yet ready to be described in full, or when the field requires a single controlled point of intake.
Use this route when the requirement is already defined enough to describe scope, field, timing, expected output, and whether the work is direct-client or partner-led.
Use this route when materials should be routed separately from the initial note, when disclosure is staged, or when the primary object of the submission is the file package itself.